Don on January 6th, 2015

Tuesday: (01/06) Bacon breakfast burrito from La Victoria to start the day. I stopped by for some base rock on the way down to San Jose. I dug the final section of trench and installed the last section of drain pipe. I decided to add a spare inlet in case the downspout configuration changes in […]

Continue reading about The Final Touches